SolarEdge S1000 Optimiser -1000W 18 A, 125 VDC LONG LEAD

Item Code: S1000-1GMXMBT
Brand:

SolarEdge


Quantity
(969 available)
Share

SolarEdge Technologies is a leader in smart energy solutions, specialising in advanced inverter systems that elevate solar power performance. Known for maximising energy yield while cutting costs, SolarEdge products make solar energy more efficient and accessible for residential and commercial users. Their innovative technology, including power optimizers, inverters, and monitoring platforms, supports real-time tracking and energy efficiency, facilitating the shift towards clean, renewable energy sources.

S1000-1GMXMBT - SolarEdge S1000 Optimiser -1000W 18 A, 125 VDC LONG LEAD

The SolarEdge S1000 Optimiser is a premium module-level power optimiser tailored for large-scale solar installations. With a 1000W capacity, it connects two photovoltaic (PV) panels (up to 500W each) in series, reducing the number of optimisers needed and lowering overall installation costs. Delivering an exceptional 99.5% efficiency, this optimiser uses advanced Maximum Power Point Tracking (MPPT) technology to optimise energy production and boost solar system revenue.

Equipped with cutting-edge "Sense Connect" technology, the S1000 ensures advanced safety by monitoring cable and connector temperatures to prevent potential arc faults. Its SafeDC™ feature further enhances safety by automatically reducing high DC voltage to touch-safe levels during grid or inverter shutdowns.

Key Features:

  • 99.5% Efficiency: Achieve maximum energy production with module-level MPPT.
  • Dual Panel Support: Connects two PV panels per optimiser for cost-effective design.
  • High-Power Module Compatibility: Ideal for bifacial and high-output PV modules.
  • Enhanced Safety: Sense Connect technology detects overheating and installation issues.
  • SafeDC™ Technology: Reduces DC voltage during shutdowns for added safety.
  • Streamlined Installation: Supports high string current with optimised cable management.

Product Specifications: 

  • Model: S1000-1GMXMBT
  • Rated Output Power: 1000W
  • Lead Type: Long lead for flexible and easy installation
  • Warranty: 12 years (extendable)
  • SolarEdge Power Optimizer Datasheet / File size: 0.83 MB
  • Solar Edge S-Series Commercial Brochure / File size: 2.1 MB
  • SolarEdge Power Optimizer EMC Certificate / File size: 0.4 MB
Brand Solar Edge
Type Optimisers