Topbar Banner Topbar Banner Topbar Banner

5.32kWh W Sunsynk Battery IP65 with long lead

Item Code: SUN-BATT-5.32-W
Brand:
Sun Synk

Quantity
(0 available)
Share

SunSynk is a leading manufacturer of advanced solar inverters and energy management systems, designed to optimise power usage for residential and commercial applications. Known for their efficiency, reliability, and innovative hybrid technology, SunSynk solutions seamlessly integrate with solar, battery storage, and grid power to deliver smart, sustainable energy management.

SUN-BATT-5.32-W - 5.32kWh W Sunsynk Battery IP65 with long lead

Sunsynk’s premium 5.32kWh Lithium-Ion Phosphate battery, the SUN-BATT-5.32-W, is engineered to the highest standards for residential and commercial energy storage systems. With up to 80% depth of discharge, it efficiently captures and stores energy from solar panels, ensuring reliable power even during outages. This battery is scalable up to 16 units, offering a maximum capacity of 85.12kWh per inverter. The W series has a double pole 125A MCB isolator built in, internal fire suppression & it will charge & discharge at low temperatures. 

Key Features: 

  • High Capacity: 5.32kWh storage capacity, ideal for both residential and commercial applications.
  • Scalability: Can be scaled up to 16 units, allowing for a maximum capacity of 85.12kWh per inverter.
  • Depth of Discharge: Supports up to 80% depth of discharge, maximizing usable energy.
  • Durable Design: Compact and robust construction, suitable for various installation environments.
  • Seamless Integration: Easily integrates with solar inverters and energy management systems.
  • Reliable Power Supply: Ensures a continuous power supply, even during outages.
  • Cost-Effective: Provides a sustainable solution for reducing grid dependency and optimizing solar energy usage.
  • Weight: 45kg
  • Dimensions: 450 x 150 x 533

  • Sunsynk Battery 5.32kW User Manual / File size: 1.81 MB
  • Sunsynk Battery W5.3 Datasheet / File size: 0.61 MB
Brand Sunsynk
Type Batteries
Power rating 4.0kW-6.0kW